RE Grid Integration Week 2026
Browse
Search
Bookmarks
Abstracts
Mon, 28 Sep
Tue, 29 Sep
Wed, 30 Sep
Thu, 1 Oct
Fri, 2 Oct
‹
Back
11:10 - 13:00
WISO SESSION 8C – OFFSHORE WIND CONNECTIONS
›
Room: Douro III
11:10 - 11:30
01 GIW26-278
Submission 278
Transmission System Design of Large Offshore Wind Power Plants
›
Hossein Khalilnezhad
, Energy Infrastructure Department, Vattenfall, Netherlands
11:30 - 11:50
02 GIW26-316
Submission 316
Optimal Black Start Restoration using Offshore Wind Farm
›
Mobolaji Bello
, Electric Power Research Institute, United States
11:50 - 12:10
03 GIW26-226
Submission 226
Connecting Offshore-Wind Farms to Shore through a Grid Intertie based on a Low Frequency AC Transmission regulated by Static Frequency Converters
›
Mattia Rossi
, Hitachi Energy Ltd, Switzerland,
Miodrag Basic
, Hitachi Energy Ltd, Switzerland
12:10 - 12:30
04 GIW26-176
Submission 176
Control and protection enabling subsea substation for HVAC-connected floating wind farms
›
Qian Long
, ABB AS, Norway,
Yuanyuan Liu
, ABB AS, Norway,
Johannes-Bedos Ulvin
, ABB AS, Norway
12:30 - 13:00
OPEN FLOOR / DISCUSSION
Bookmark